https://apm.activecommunities.com/cityofsandimas/H Employment Opportunities Parking Matters San Dimas Weekly E-dition Click here to view homeless assistance resources Downtown Holiday Extravaganza Event Information http://www.cityofsandimas.com/ps.publicsafety.cfm? Family Prep  Click Here to View Residential Trash Rates San Dimas Frontier Newsletter & Recreation Guide
Walker HouseWalker House

Marchant Park Improvement Project

Slideshow

New Recreation Building with 600 sq.ft. addition

The City of San Dimas Parks and Recreation Department is renovating and expanding the existing Recreation Building and replacing the play equipment at Marchant Park, 425 E. Juanita Avenue, as well as renovating several buildings and structures.

The existing recreation building will be renovated through the addition of 600 square feet of space, providing for ADA accessibility upgrades, restoration of interior finishes, and modification of the building exterior. The existing restroom building will be replaced by a larger and ADA accessible pre-fabricated restroom building. The new restroom will service three times the capacity of the current facility and a new concrete walkway will be constructed leading to it.

The project includes the removal of the two existing outdated playgrounds which will be replaced by ADA accessible playgrounds and pathways. The new play areas will feature more challenging play equipment and include full ADA access for the apparatus, a sand play table, and the swings. There will be a swing specifically for children with limited mobility. The current sand surfacing will be replaced with ADA compliant rubber surfacing beneath the play structures.

The project began on September 18 and is anticipated to be completed by Spring 2018. For more information, please contact the Parks and Recreation Department at 909-394-6230.

UPDATES

October 3, 2017

The Marchant Park Improvement Project is well underway. The demolition of existing playgrounds, public restrooms, sidewalks and recreation building are being completed.

The old play equipment was removed and new ADA accessible playgrounds will be installed with the new playground rubber surfacing.

The public restroom building has been demolished and a larger ADA accessible pre-fabricated restroom building will be installed in its place.

October 16, 2017

The recreation building is in the process of being demolished. The existing picnic shelters will be refurbished with new roofs installed and the structures painted.

Moreover, improvements in the park will also include exterior improvements to the Snack Bar Concession building, renovation of the basketball and tennis courts, and a new picnic area near the baseball fields.

November 22, 2017

This week, the concrete forming by the basketball court and playground area in Marchant Park is being done. This new play area will feature more challenging play equipment and include full ADA access for the apparatus, a sand play table, and the swings.

New concrete sidewalk by the baseball fields was completed and improvement of the Storage Building is underway with the windows being bricked in.

©2003-17 City of San Dimas    245 East Bonita Avenue    San Dimas, CA 91773    909-394-6200
City Hall Hours: Monday thru Thursday 7:30 a.m. to 5:30 p.m.    Friday 8:00 a.m. to 5:00 p.m.
Website Design and Management by Highpoint Web Design, LLC